Basin Electric Power Cooperative’s 162 MW Wind Farm is the Largest in South Dakota

The Daily Republic reports that once all 100 turbines are operational, Basin Electric will exceed its goal of generating at least 10 percent of its power from renewable sources.  Construction of the $363 million dollar PraireWinds SD 1 project began last year and all turbines should be online by the middle of February.

Back to top