Basin Electric to Invest in Transmission Line Projects
Basin Electric will invest nearly half a billion dollars to develop three projects: the East Loop transmission project, the Roundup-to-Kummer Ridge transmission line, and the East Fork substation. The projects are expected to be completed by 2024 and 2025 and will support load growth in both residential and commercial power loads.