Short-Term Deal Made to Maintain Grid Reliability
The Electric Division, based in Wallingford, Connecticut, and the Connecticut Municipal Electric Energy Cooperative (CMEEC) have reached a short-term agreement to ensure critical transmission data continues to flow between Wallingford and the regional grid operator ISO-New England. The Electric Division will have access to CMEEC’s transmitting equipment until June, at which time the municipal utility plans to purchase its own equipment. Read more here.