Microgrid Being Planned Near Aspen, Colorado
Electric cooperative Holy Cross Energy, the Roaring Fork Transportation Authority, and Pitkin County representatives are conducting a feasibility study for a local, renewable energy microgrid. The proposed microgrid would connect the Aspen-Pitkin County Airport with neighboring public facilities and would be incorporated into the existing infrastructure of Holy Cross Energy.